High Frequency Heating Equipment (Small Catheter Tip Reducing Machine Heater)

  • Description

1. Industry application:

1. Welding

1) Welding of carbide tools. Such as turning tools, milling cutters, reamer.

2) Welding of diamond bits. Such as diamond saw blades, abrasive tools, sawtooth welding. Welding of drill bits for prospecting, such as welding of a sub-drill and a claw bit.

3) Composite welding of metal materials such as brass, copper, stainless steel, etc.

2. Heat fitting and heat fusion equipment

1) The heating of the motor rotor and the water pump shell, and the heating of the bearing sleeve. Thermal fusion of plastic handle of tableware, etc.

2) Heating lamination of aluminum-plastic pipes, cables and wires; aluminum foil sealing used in food, beverage, and pharmaceutical industries, preheating expansion of metals, etc.

3. Quenching

Surface, inner hole, partial or overall quenching of various hardware tools, electric, hydraulic, pneumatic components, auto parts, motorcycle parts and other mechanical metal parts

4. Annealing equipment

It can perform overall or partial annealing treatment for various mechanical parts, and tensile annealing for stainless steel products within a diameter of 50

1) Heat the metal material for stretching, molding, embossing, etc. Such as steel pipe stretching, pipe bending, head smashing; iron wire, steel wire heating nailing

3) Heating and annealing metal materials. Such as steel pipe drawing, pipe bending; smashing head, iron wire, steel wire heating nails, stainless steel products

5. Smelting

1) Melting gold/copper/silver: 1-5kg

2) molten steel/aluminum: 1-3kg


2. Main features:

1. Simple installation, only need to connect electricity and water to use, no need for special installation

2. Easy to operate: you can learn in a few minutes

3. Quick start: the heating can be started after the water is turned on

4. Less power consumption: Compared with old-fashioned high-frequency equipment, it saves power, and the smaller the workpiece, the less power consumption

5, the effect is good: the heating is very uniform, the temperature rises quickly, and the oxide layer is less.

6. Adjustable power: adjustable output power

7. Full protection: with overvoltage, overcurrent, overheating, water shortage and other alarm indications, and automatic control and protection


3. Operation steps

1. Water: Start the water pump and observe whether the water flow at the water outlet is normal.

2. Power on: first close the knife, then turn on the air switch at the back of the machine, and then turn on the power switch on the control board.

3. Setting: Select the operation mode (full automatic, semi-automatic, manual and foot control) according to your needs. When automatic and semi-automatic control, you need to set the heating time, holding time and cooling time (each time cannot be set to 0, otherwise it will not work properly). automatic cycle). Before using it for the first time and before you are proficient, you should use manual or foot control.

4. Start: Before each start, the heating power potentiometer should be adjusted to the minimum as much as possible, and then slowly adjust the temperature to the required power after starting. Press the start button to start the machine, at this time the heating indicator on the panel is on, and there will be a sound of normal work and the simultaneous flashing of the work light.

5. Observation and temperature measurement: During the heating process, visual inspection is mainly used to determine when to stop heating based on experience. Inexperienced operators can use a thermostat to detect the temperature of the workpiece.

6. Stop: When the temperature reaches the requirement, press the stop button to stop heating. You can start it again after replacing the workpiece.

7. Shutdown: The machine can work continuously for 24 hours. The power switch should be turned off when not in use, and the knife or the air switch at the rear of the machine should be turned off when not in use for a long time. When shutting down, the power should be cut off first and then the water should be cut off, so as to facilitate the heat dissipation inside the machine and the heat of the induction coil. Note: The machine should not work without load as much as possible, let alone run without load for a long time, otherwise, it will affect the performance and stability of the machine!


4. Precautions for use

1. In order to prevent electric shock, please ensure that the electrical specifications of the casing are reliably grounded.

2. The removal and installation of the sensor must be carried out after the heating stops.

3. Strictly implement the principle of water first and then electricity. Water shortage is strictly prohibited during the working process. The water quality and pressure of the cooling water inside the equipment and the sensor must meet the requirements of Table 2. In order to avoid blocking the cooling pipeline, if the water supply is supplied by a water pump, please install a filter at the water inlet of the water pump. The cooling water temperature should not be higher than 45°C, and the water flow rate should be 10T/h (softened water is recommended)

4. The equipment should be protected from sunlight, rain, moisture, dust, etc. When repairing or maintaining the equipment is required, it must be done one hour after the power is turned off.

5. In-machine cleaning method Blown with compressed air or blower every week. The circuit board is cleaned with a brush and then blown clean.

6. Ordinary users should clean the waterway of the machine with a special descaling agent (available from our company) every 4 months. When the machine frequently alarms the water temperature, or observes that the water flow of the water outlet decreases significantly, it should be cleaned immediately.

7. The sensor should be kept clean to prevent short circuit between turns.

8. This device cannot use single-turn inductors. Otherwise, the device may be damaged due to too small inductive reactance. In special cases, please consult the manufacturer.

9. When replacing the sensor, the contact surface between the sensor connection board and the transformer should be cleaned with sandpaper to maintain good electrical conductivity.

 

5. Technical parameters

model

RAG-15KW


model

RAG-25KW

power

15KW


power

 25KW

Input Current

23A


Input Current

32A

Oscillation frequency

30-100KHZ


Oscillation frequency

30-100KHZ

Input voltage

Simplex220V


Input voltage

三相380V

molten gold

1-3kg


molten gold

1-5kg

volume(cm)

42*20*36


volume(cm)

57*22*46

weight(KG)

20


weight(KG)

28

 

6. Troubleshooting and troubleshooting

Fault

possible reason

Solution

After turning on the power switch, the "Power" indicator does not light up

1 The panel power switch is in poor contact

21P air circuit breaker trip

3 Phase loss


1 Close and open, repeat several times

21P air open to send on

3 Check the power supply voltage


After stepping on the foot switch, the work light does not light up

1 Foot switch lead off

2 The AC contactor is not closed or the contact is poor

3 Poor contact of the sensor


1 Check the foot switch lead wire or AC contactor or sensor

Adjust the panel power to the maximum, no current indication or the current is too small

1 The number of turns of the inductor is too much or the load is too heavy

2 sensor short circuit

3 Poor contact at the sensor

4 half bridge work


1 Reconfigure the sensor

2 reboot after separation and it works fine

3 Grinding or pickling at joints

4 Contact the manufacturer


The workpiece cannot be heated after being placed

1 The external power supply capacity is small or the wire is too thin

2 phase loss

3 The number of turns of the inductor is too much or the load is too heavy

4 half bridge work

1 Increase the power capacity

2 Check the three-phase power supply

3 Reconfigure the sensor

4 Contact the manufacturer


Overcurrent alarm

1 The contact of the sensor is bad or short circuit

2 The contacts of the AC contactor are in poor contact

3 Too many or too few turns of the inductor

4 ignition at the external power connector

5 Poor contact of high-frequency cables

6 Power board failure

7 There is a spark inside

8 The resonant transformer is bad

1 Check the sensor, high frequency cable, external power supply

2 Replace the AC contactor

3 Reduce the number of inductor turns

4 Check the power tube


water pressure alarm

1 The water pressure is too low

2 limescale clogging

3 The water pressure switch is broken

1 Increase the water pressure

2 Clean the limescale

3 Replace the water pressure switch

water temperature alarm

1 The water temperature is too high

2 The water flow is too small

3 water pipe blockage

4 Too much scale inside

1 Change the cooling water

2 Increase the water pump or water pressure

3 Clean with descaling agent 1 40

4 Replace the water temperature relay

Recommended Products

HOME About Us Product News Case Video Advantages Contact
亚洲天堂在线播放| 好男人天堂网 久久精品国产这里是免费 国产精品成人一区二区 男人天堂网2021 男人的天堂在线观看 丁香六月综合激情 | 天天做人人爱夜夜爽2020| 精品视频在线观看视频免费视频 | 亚洲精品中文一区不卡| 欧美激情一区二区三区视频| 国产a免费观看| 日日爽天天| 国产韩国精品一区二区三区| 一级女性全黄久久生活片| 亚久久伊人精品青青草原2020| 欧美一区二区三区性| 一级毛片视频在线观看| 国产视频一区在线| 999精品在线| 91麻豆精品国产片在线观看| 日韩欧美一二三区| 欧美另类videosbestsex高清| 九九精品在线播放| 亚洲精品中文一区不卡| 国产亚洲精品aaa大片| 美国一区二区三区| 日韩av片免费播放| 成人影院一区二区三区| 高清一级毛片一本到免费观看| 久久99中文字幕久久| 久久国产精品只做精品| 国产麻豆精品免费视频| 精品在线视频播放| 国产伦久视频免费观看视频| 亚欧乱色一区二区三区| 成人免费观看视频| 99热精品在线| 成人免费一级纶理片 | 久久精品免视看国产明星| 韩国毛片| 欧美激情伊人| 日韩免费片| 欧美激情一区二区三区视频高清| 国产网站免费| 欧美a级成人淫片免费看| 日韩在线观看网站| 国产极品精频在线观看| 色综合久久天天综合观看| 成人高清视频在线观看| 日本在线播放一区| 黄色免费三级| 91麻豆国产福利精品| 日韩一级精品视频在线观看| 国产不卡高清| 四虎影视库| 日韩一级精品视频在线观看| 久久国产影院| 日本免费乱理伦片在线观看2018| 可以免费看毛片的网站| 韩国毛片免费大片| 国产不卡在线观看| 久久99这里只有精品国产| 99色视频| 日本在线www| 日韩欧美一二三区| 免费的黄色小视频| 久久99中文字幕久久| 韩国三级视频网站| 国产麻豆精品| 精品久久久久久综合网| 免费的黄色小视频| 成人av在线播放| 亚洲精品久久玖玖玖玖| 午夜在线亚洲男人午在线| 日本免费区| 天天做日日爱| 久久99中文字幕久久| 国产一区二区精品久| 一级毛片视频在线观看| 青青久久精品| 日本在线不卡视频| 青青青草影院| 九九精品久久久久久久久| 天天做人人爱夜夜爽2020| 欧美激情影院| 深夜做爰性大片中文| 欧美国产日韩久久久| 台湾美女古装一级毛片| 日日爽天天| 欧美一区二区三区性| 久久精品成人一区二区三区| 好男人天堂网 久久精品国产这里是免费 国产精品成人一区二区 男人天堂网2021 男人的天堂在线观看 丁香六月综合激情 | 久久国产精品自线拍免费| 精品久久久久久中文| 可以在线看黄的网站| 青青青草影院| 日韩专区一区| 中文字幕一区二区三区精彩视频| 韩国三级视频网站| 欧美另类videosbestsex久久| 一 级 黄 中国色 片| 国产一区二区高清视频| 久久99中文字幕| 欧美一级视频高清片| 99久久精品国产高清一区二区| 国产视频一区在线| 一级片片| 国产一级生活片| 日本久久久久久久 97久久精品一区二区三区 狠狠色噜噜狠狠狠狠97 日日干综合 五月天婷婷在线观看高清 九色福利视频 | 亚洲第一视频在线播放| 青青久久精品| 二级特黄绝大片免费视频大片| 尤物视频网站在线观看| 成人免费观看男女羞羞视频| 欧美国产日韩精品| 久久精品免视看国产明星| 色综合久久久久综合体桃花网| 国产不卡福利| 毛片高清| 色综合久久天天综合绕观看| 九九久久国产精品大片| 日韩专区一区| 九九九网站| 成人免费观看网欧美片| 久久精品道一区二区三区| 中文字幕97| 久久国产精品只做精品| 日韩在线观看免费| 久久99爰这里有精品国产| 一级毛片看真人在线视频| 日韩av成人| 成人a级高清视频在线观看| 日韩专区一区| 成人在激情在线视频| 免费国产一级特黄aa大片在线| 欧美1区2区3区| 国产国产人免费视频成69堂| 国产精品自拍一区| 亚洲精品影院| 麻豆午夜视频| 亚州视频一区二区| 欧美一级视| 精品国产亚一区二区三区| 精品久久久久久综合网| 国产综合91天堂亚洲国产| 国产麻豆精品视频| 日本在线不卡视频| 韩国三级视频网站| 99色视频在线| 中文字幕97| 国产一区二区精品久| 天堂网中文在线| 九九干| 国产成a人片在线观看视频 | 毛片高清| 欧美大片一区| 99久久精品国产麻豆| 久久99青青久久99久久| 天天色色网| 亚洲天堂一区二区三区四区| 久久精品大片| 四虎影视久久久| 欧美夜夜骑 青草视频在线观看完整版 久久精品99无色码中文字幕 欧美日韩一区二区在线观看视频 欧美中文字幕在线视频 www.99精品 香蕉视频久久 | 日本免费区| 好男人天堂网 久久精品国产这里是免费 国产精品成人一区二区 男人天堂网2021 男人的天堂在线观看 丁香六月综合激情 | 一本高清在线| 精品国产一区二区三区久久久蜜臀| 日本特黄特色aaa大片免费| 韩国毛片免费| 四虎影视精品永久免费网站| 成人影视在线播放| 九九热精品免费观看| 欧美一级视频免费观看| 欧美另类videosbestsex久久 | 欧美激情一区二区三区在线| 久久99爰这里有精品国产| 精品国产一区二区三区久久久蜜臀 | 国产一区二区精品| 午夜在线亚洲| 成人高清免费| 国产成人精品一区二区视频| 久久精品成人一区二区三区| 99久久精品国产麻豆| 日本在线播放一区| 你懂的福利视频| 午夜激情视频在线播放| 成人免费观看男女羞羞视频| 日韩在线观看视频网站| 黄视频网站免费观看| 色综合久久手机在线| 九九久久国产精品| 天天色色网| 免费的黄色小视频| 99久久网站| 麻豆午夜视频| 国产伦精品一区二区三区无广告 | 天堂网中文在线| 一级女性全黄生活片免费| 国产不卡在线看| 欧美1区| 久久国产精品只做精品| 免费的黄色小视频| 韩国毛片免费大片| 国产网站免费|